Passive Fire Protection for Student Accommodation.

Often living away from home for the first time, student accommodation is a central part of the university experience and universities nationwide are building new halls to accommodate increasing student numbers and refurbishing older halls to improve their students’ experience.

Often housed in multi-storey apartment blocks, student accommodation works share many similarities and risks with residential works. Through the installation of tested, approved and compliant passive fire protection, these risks become manageable, protecting the lives of the students as well as their property.

Pyrotect has developed extensive experience in student accommodation, having delivered intumescent paint, firestopping and air and acoustic sealing on projects such as these from Lancaster to Southampton, Worcester to Hull and several in between. 

New build facilities across the UK

Pyrotect is delighted to bring, and have brought, our experience and knowledge to a wide range of new-build sites in so many locations. Throughout the project we work closely with main contractors: from understanding the needs and regulatory requirements of the development at initial enquiry stage to handover of works with O&Ms and certification on completion, whilst deploying knowledgeable and experienced teams to maintain communication on site and providing ongoing quality assurance evidence during the course of the build.  

This process has benefitted a number of highly successful projects, including extensive intumescent paint and firestopping packages at St Albans Place, Leeds for Kier, Knight House and Denby Street in Sheffield for nmcn and both Galliford Try and Vallectric in Coventry.

New build site? Our Sales team will be pleased to talk through your site and the specification you are working to build a realistic quotation whether you are at tender stage or have an order to place. Call the team on 01530 416870 or email sales@pyrotect.co.uk

Fire surveys, maintenance and remedial works

Modernisation of existing student accommodation stock has become increasingly prevalent as universities seek to offer the best experience possible for their students in a highly competitive market. The damage that can occur to compartmentation lines through refurbishment, installations and upgrades of HVAC and security systems or cabling works, however, can create unknown, unrecognised and unnecessary risks. A thorough fire survey can identify vulnerabilities and non-compliance in the existing passive fire protection measures, and is an integral part of developing a remedial works programme.

Following a pre-start meeting, our fully-briefed teams will install all the necessary remedial requirements, generating a quality assurance audit trail as they pass through the building. Mindful that these premises are of course occupied, our Contracts Managers will work closely with the main facilities team or building manager to ensure that scheduling and sequencing minimise the impact of works on students, with flexibility around exam dates, preference for the summer holidays etc. Meanwhile our site teams are sensitive to their presence in students’ homes and the need for greater management of noise and dust, as well as security awareness around entry systems and fire exits.

Our commitment:

In order to meet the additional needs of student accommodation sites, our teams provide the following:

  • Pre-start meeting to capture all site-specific needs and considerations, and outline sequencing
  • Deployment of qualified, experienced site installation teams
  • Detailed, site-specific RAMS
  • Briefing with site teams prior to commencement
  • Regular catch-ups with site/facilities teams to ensure smooth project delivery, check sequencing flow is still workable and address any changes (particularly in occupied developments)
  • Flexibility in working patterns to suit the flow of live sites
  • DBS checked/ enhanced security clearance on site teams where required
  • Value-based contracts, supporting project objectives in quality, sustainability and social value
  • Quality assurance throughout and certification on completion

Facilities Manager of an existing facility? Our certified fire inspectors can walk you through the fire survey process and identify any areas of non-compliance that put you at increased risk. Contact the team on 01530 416870 for more information